Drilling Appointments

Confirm Your Appointment
With our easy online booking system, let us know which date our service is needed as well as the project details.
Get Started ➝
Place A Locate Request
Get in touch with InfoExcavation to locate any underground infrastructure running through your property.
Note: This document is mandatory and must be complete prior to our arrival. Otherwise, we will not drill and your appointment will be moved to a later date.
Make A Request➝
Mark Your Holes
Place a string line and markers to let us know exactly where you would like your holes drilled.


TIP: When marking your holes for a fence consisting of 8ft sections, mark your holes 90 inches apart from center to center. This method ensures your sections won't be over 8ft thus giving you the versatility of cutting your 2x4s to size.

Prepare Your Space to Save Costs
Please ensure that all personal belongings have been removed from the workspace and from the machine's path into the yard.
Note: A minimum space of 60 inches is needed for the large machine and 36 inches for the small machine.
Fence Appointments

Confirm Your Appointment
With our easy online booking system, let us know which date our service is needed as well as the project details.
Get Started ➝
Place A Locate Request
Get in touch with InfoExcavation to locate any underground infrastructure running through your property.
Make a Request ➝* Please send this certificate via email before our arrival.

Obtain a Certificate of Location
An up-to-date certificate of location is an important and necessary part of the overall project. This certificate outlines the presence of any servitudes affecting your property rights. In addition, it allows us to maximize your space by building your new fence to your property's boundary.
* Please send this certificate via email or hand us a copy upon arrival.

Prepare Your Space to Save Costs
Please ensure that all personal belongings have been removed from the workspace and from the machine's path into the yard.
Note: A minimum space of 60 inches is needed for the large machine and 36 inches for the small machine.

Ensure Utility Access
Water and electricity access will be needed for the duration of the job. If electricity is not a possibility, please let us know in advance. For an extra cost, a generator will be provided.
Fence Repair Appointments

Confirm Your Appointment
With our easy online booking system, let us know which date our service is needed as well as the project details.
Get Started ➝
Prepare Your Space to Save Costs
Please ensure that all personal belongings have been removed from the workspace and from the machine's path into the yard.
Note: A minimum space of 60 inches is needed for the large machine and 36 inches for the small machine.

Ensure Utility Access
Water and electricity access will be needed for the duration of the job. If electricity is not a possibility, please let us know in advance. For an extra cost, a generator will be provided.
